July 2014

Next >>
Sun Mon Tue Wed Thu Fri Sat
    1

2014 Summer Housing Painting |
5/12 -> 7/01

14-1287 CT4 - Replace Drain Lines and Ceiling in Student Bathrooms | Carmichael Towers 3&4
5/12 -> 7/03

project #1491 Lewis House 2014 Summer Housing Painting |
5/12 -> 7/01

project #1490 Morgan House 2014 Summer Housing Painting |
5/12 -> 7/01

project #1497 Stambaugh House 2014 Summer Housing Painting |
5/12 -> 7/01

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/01

FY14 R & R Project #14-1221 Olin Hall Roof Replacement |
5/14 -> 7/01

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

14-1300 North Hall - Replace Shower Pans and Isolation Valves |
5/15 -> 7/03

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Need a spot to set dumpster at Carmichael Tower 4 Preferably at/near loading dock.
5/19 -> 7/11

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

Divinity Lighting & Lighting Control Project |
6/16 -> 7/11

Garland Remodel | Garland Hall
6/16 -> 7/03

14-1331 Olin Hall - Remodel Rooms 219, 406, 406a, 406b |
6/16 -> 7/03

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Montgomery Bell Academy |
6/27 -> 7/02

Montgomery Bell Academy |
6/27 -> 7/02

Mission X |
6/29 -> 7/03

Hillvue Heights - Mission X |
6/29 -> 7/03

Hillvue Heights - Mission X |
6/29 -> 7/03

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

SLC Ballroom - Carpet Installation | Student Life Center
7/01 -> 7/03

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

2

14-1287 CT4 - Replace Drain Lines and Ceiling in Student Bathrooms | Carmichael Towers 3&4
5/12 -> 7/03

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

14-1300 North Hall - Replace Shower Pans and Isolation Valves |
5/15 -> 7/03

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Need a spot to set dumpster at Carmichael Tower 4 Preferably at/near loading dock.
5/19 -> 7/11

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

Divinity Lighting & Lighting Control Project |
6/16 -> 7/11

Garland Remodel | Garland Hall
6/16 -> 7/03

14-1331 Olin Hall - Remodel Rooms 219, 406, 406a, 406b |
6/16 -> 7/03

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Montgomery Bell Academy |
6/27 -> 7/02

Montgomery Bell Academy |
6/27 -> 7/02

Mission X |
6/29 -> 7/03

Hillvue Heights - Mission X |
6/29 -> 7/03

Hillvue Heights - Mission X |
6/29 -> 7/03

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

SLC Ballroom - Carpet Installation | Student Life Center
7/01 -> 7/03

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Video Game PD | Wyatt Center
7/02 -> 7/02

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

iPAD Technology | 315 MRL/One Magnolia Circle
7/02 -> 7/02

RV parking for Dr. Bonnie Pilon |
7/02 -> 7/02

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

3

14-1287 CT4 - Replace Drain Lines and Ceiling in Student Bathrooms | Carmichael Towers 3&4
5/12 -> 7/03

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

14-1300 North Hall - Replace Shower Pans and Isolation Valves |
5/15 -> 7/03

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Need a spot to set dumpster at Carmichael Tower 4 Preferably at/near loading dock.
5/19 -> 7/11

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

Divinity Lighting & Lighting Control Project |
6/16 -> 7/11

Garland Remodel | Garland Hall
6/16 -> 7/03

14-1331 Olin Hall - Remodel Rooms 219, 406, 406a, 406b |
6/16 -> 7/03

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Mission X |
6/29 -> 7/03

Hillvue Heights - Mission X |
6/29 -> 7/03

Hillvue Heights - Mission X |
6/29 -> 7/03

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

SLC Ballroom - Carpet Installation | Student Life Center
7/01 -> 7/03

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1520 Wilson Hall - Replace Cabinets and Epoxy Floors in Ante Rooms | Wilson Hall
7/03 -> 7/13

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

4

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Need a spot to set dumpster at Carmichael Tower 4 Preferably at/near loading dock.
5/19 -> 7/11

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

Divinity Lighting & Lighting Control Project |
6/16 -> 7/11

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1520 Wilson Hall - Replace Cabinets and Epoxy Floors in Ante Rooms | Wilson Hall
7/03 -> 7/13

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

5

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Need a spot to set dumpster at Carmichael Tower 4 Preferably at/near loading dock.
5/19 -> 7/11

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

Divinity Lighting & Lighting Control Project |
6/16 -> 7/11

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1520 Wilson Hall - Replace Cabinets and Epoxy Floors in Ante Rooms | Wilson Hall
7/03 -> 7/13

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Memorial Service for Hans Martin Weingartner |
7/05 -> 7/05

Lillie - Glaws Wedding |
7/05 -> 7/05

6

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Need a spot to set dumpster at Carmichael Tower 4 Preferably at/near loading dock.
5/19 -> 7/11

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

Divinity Lighting & Lighting Control Project |
6/16 -> 7/11

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1520 Wilson Hall - Replace Cabinets and Epoxy Floors in Ante Rooms | Wilson Hall
7/03 -> 7/13

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Nashville Summer Business Camp #2 |
7/06 -> 7/11

7

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Need a spot to set dumpster at Carmichael Tower 4 Preferably at/near loading dock.
5/19 -> 7/11

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

Divinity Lighting & Lighting Control Project |
6/16 -> 7/11

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1520 Wilson Hall - Replace Cabinets and Epoxy Floors in Ante Rooms | Wilson Hall
7/03 -> 7/13

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Nashville Summer Business Camp #2 |
7/06 -> 7/11

Project #14-1131 |
7/07 -> 7/07

14-1559 Divinity - Install HVAC in Room 102 | Lot 6B by Divinity
7/07 -> 7/11

Upward Bound |
7/07 -> 7/11

Upward Bound |
7/07 -> 7/11

Rand Hall 305 Project | Rand Hall Loading Dock
7/07 -> 7/11

Blair School AHU Repair | Blair School
7/07 -> 7/11

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

SAVY Program |
7/07 -> 7/11

PLAN Summer Session | Wyatt Center
7/07 -> 7/07

Vanderbilt Kennedy Center Parent Support Group/Grupo de Apoyo para Padres de Vanderbilt Kennedy Center | One Magnolia Circle
7/07 -> 7/07

PreVU |
7/07 -> 7/07

8

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Need a spot to set dumpster at Carmichael Tower 4 Preferably at/near loading dock.
5/19 -> 7/11

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

Divinity Lighting & Lighting Control Project |
6/16 -> 7/11

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1520 Wilson Hall - Replace Cabinets and Epoxy Floors in Ante Rooms | Wilson Hall
7/03 -> 7/13

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Nashville Summer Business Camp #2 |
7/06 -> 7/11

14-1559 Divinity - Install HVAC in Room 102 | Lot 6B by Divinity
7/07 -> 7/11

Upward Bound |
7/07 -> 7/11

Upward Bound |
7/07 -> 7/11

Rand Hall 305 Project | Rand Hall Loading Dock
7/07 -> 7/11

Blair School AHU Repair | Blair School
7/07 -> 7/11

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

SAVY Program |
7/07 -> 7/11

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1331 Olin Hall - Remodel Rooms 406 and 219 | Lot 16 Near Olin Hall
7/08 -> 7/18

Guest Speakers - Connor & Cook | Mayborn
7/08 -> 7/08

PLAN Summer Session | Wyatt Center
7/08 -> 7/08

9

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Need a spot to set dumpster at Carmichael Tower 4 Preferably at/near loading dock.
5/19 -> 7/11

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

Divinity Lighting & Lighting Control Project |
6/16 -> 7/11

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1520 Wilson Hall - Replace Cabinets and Epoxy Floors in Ante Rooms | Wilson Hall
7/03 -> 7/13

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Nashville Summer Business Camp #2 |
7/06 -> 7/11

14-1559 Divinity - Install HVAC in Room 102 | Lot 6B by Divinity
7/07 -> 7/11

Upward Bound |
7/07 -> 7/11

Upward Bound |
7/07 -> 7/11

Rand Hall 305 Project | Rand Hall Loading Dock
7/07 -> 7/11

Blair School AHU Repair | Blair School
7/07 -> 7/11

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

SAVY Program |
7/07 -> 7/11

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1331 Olin Hall - Remodel Rooms 406 and 219 | Lot 16 Near Olin Hall
7/08 -> 7/18

PLAN Summer Session | Wyatt Center
7/09 -> 7/09

NCA Cheer Camp |
7/09 -> 7/13

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

Independent School Leadership | Payne Hall, Magnolia Circle
7/09 -> 7/09

SENSE Theatre | Vanderbilt Kennedy Center
7/09 -> 7/09

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

10

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Need a spot to set dumpster at Carmichael Tower 4 Preferably at/near loading dock.
5/19 -> 7/11

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

Divinity Lighting & Lighting Control Project |
6/16 -> 7/11

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1520 Wilson Hall - Replace Cabinets and Epoxy Floors in Ante Rooms | Wilson Hall
7/03 -> 7/13

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Nashville Summer Business Camp #2 |
7/06 -> 7/11

14-1559 Divinity - Install HVAC in Room 102 | Lot 6B by Divinity
7/07 -> 7/11

Upward Bound |
7/07 -> 7/11

Upward Bound |
7/07 -> 7/11

Rand Hall 305 Project | Rand Hall Loading Dock
7/07 -> 7/11

Blair School AHU Repair | Blair School
7/07 -> 7/11

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

SAVY Program |
7/07 -> 7/11

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1331 Olin Hall - Remodel Rooms 406 and 219 | Lot 16 Near Olin Hall
7/08 -> 7/18

NCA Cheer Camp |
7/09 -> 7/13

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

TN Consortium | Peabody College, Wyatt Center
7/10 -> 7/10

Independent School Leadership | Payne Hall, Magnolia Circle
7/10 -> 7/10

Discovery Education |
7/10 -> 7/18

Parent Coalition Meeting | Magnolia Circle
7/10 -> 7/10

11

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Need a spot to set dumpster at Carmichael Tower 4 Preferably at/near loading dock.
5/19 -> 7/11

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

Divinity Lighting & Lighting Control Project |
6/16 -> 7/11

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1520 Wilson Hall - Replace Cabinets and Epoxy Floors in Ante Rooms | Wilson Hall
7/03 -> 7/13

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Nashville Summer Business Camp #2 |
7/06 -> 7/11

14-1559 Divinity - Install HVAC in Room 102 | Lot 6B by Divinity
7/07 -> 7/11

Upward Bound |
7/07 -> 7/11

Upward Bound |
7/07 -> 7/11

Rand Hall 305 Project | Rand Hall Loading Dock
7/07 -> 7/11

Blair School AHU Repair | Blair School
7/07 -> 7/11

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

SAVY Program |
7/07 -> 7/11

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1331 Olin Hall - Remodel Rooms 406 and 219 | Lot 16 Near Olin Hall
7/08 -> 7/18

NCA Cheer Camp |
7/09 -> 7/13

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Discovery Education |
7/10 -> 7/18

PreVU |
7/11 -> 7/11

Lot 18 Olin Hall Project |
7/11 -> 7/17

Guest Speaker - McKinney | Mayborn
7/11 -> 7/11

12

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1520 Wilson Hall - Replace Cabinets and Epoxy Floors in Ante Rooms | Wilson Hall
7/03 -> 7/13

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1331 Olin Hall - Remodel Rooms 406 and 219 | Lot 16 Near Olin Hall
7/08 -> 7/18

NCA Cheer Camp |
7/09 -> 7/13

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Discovery Education |
7/10 -> 7/18

Lot 18 Olin Hall Project |
7/11 -> 7/17

EMBA Math Camp | 21st Avenue South & Broadway
7/12 -> 7/12

VU Men's Baseball Camp |
7/12 -> 7/17

EMBA Math & Stats Camp | 21st Avenue South & Broadway
7/12 -> 7/12

Kennedy NSSI |
7/12 -> 7/18

Campus Pride |
7/12 -> 7/20

Campus Pride |
7/12 -> 7/20

Teaching For Economics |
7/12 -> 7/20

NSSI training |
7/12 -> 7/12

13

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1520 Wilson Hall - Replace Cabinets and Epoxy Floors in Ante Rooms | Wilson Hall
7/03 -> 7/13

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1331 Olin Hall - Remodel Rooms 406 and 219 | Lot 16 Near Olin Hall
7/08 -> 7/18

NCA Cheer Camp |
7/09 -> 7/13

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Discovery Education |
7/10 -> 7/18

Lot 18 Olin Hall Project |
7/11 -> 7/17

VU Men's Baseball Camp |
7/12 -> 7/17

Kennedy NSSI |
7/12 -> 7/18

Campus Pride |
7/12 -> 7/20

Campus Pride |
7/12 -> 7/20

Teaching For Economics |
7/12 -> 7/20

Kennedy NSSI Parent Parking |
7/13 -> 7/13

Campus Pride |
7/13 -> 7/20

14

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

R & R 2014 Project #14-1221 Re-roof Olin Hall |
7/02 -> 7/14

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1331 Olin Hall - Remodel Rooms 406 and 219 | Lot 16 Near Olin Hall
7/08 -> 7/18

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Discovery Education |
7/10 -> 7/18

Lot 18 Olin Hall Project |
7/11 -> 7/17

VU Men's Baseball Camp |
7/12 -> 7/17

Kennedy NSSI |
7/12 -> 7/18

Campus Pride |
7/12 -> 7/20

Campus Pride |
7/12 -> 7/20

Teaching For Economics |
7/12 -> 7/20

Campus Pride |
7/13 -> 7/20

13-1325 Wyatt Center - Remodel 3rd Floor Offices | Lot 90 Near Wyatt Center
7/14 -> 7/25

Independent School Leadership | Payne Hall, Magnolia Circle
7/14 -> 7/14

SAVY Program |
7/14 -> 7/18

PreVU |
7/14 -> 7/14

EMAM Advisory Council | 18th Avenue South (either Edgehill or horton)
7/14 -> 7/14

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

VU Kennedy NSSI |
7/14 -> 7/18

Strategic Innovation Program | The Center Building (OGSM section on top parking pad)
7/14 -> 7/15

15

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1331 Olin Hall - Remodel Rooms 406 and 219 | Lot 16 Near Olin Hall
7/08 -> 7/18

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Discovery Education |
7/10 -> 7/18

Lot 18 Olin Hall Project |
7/11 -> 7/17

VU Men's Baseball Camp |
7/12 -> 7/17

Kennedy NSSI |
7/12 -> 7/18

Campus Pride |
7/12 -> 7/20

Campus Pride |
7/12 -> 7/20

Teaching For Economics |
7/12 -> 7/20

Campus Pride |
7/13 -> 7/20

13-1325 Wyatt Center - Remodel 3rd Floor Offices | Lot 90 Near Wyatt Center
7/14 -> 7/25

SAVY Program |
7/14 -> 7/18

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

VU Kennedy NSSI |
7/14 -> 7/18

Strategic Innovation Program | The Center Building (OGSM section on top parking pad)
7/14 -> 7/15

Independent School Leadership | Payne Hall, Magnolia Circle
7/15 -> 7/15

Law School - remove mailboxes | Law School
7/15 -> 7/16

Annual Visiting Scholars Day Dinner | Commons Center
7/15 -> 7/15

16

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1331 Olin Hall - Remodel Rooms 406 and 219 | Lot 16 Near Olin Hall
7/08 -> 7/18

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Discovery Education |
7/10 -> 7/18

Lot 18 Olin Hall Project |
7/11 -> 7/17

VU Men's Baseball Camp |
7/12 -> 7/17

Kennedy NSSI |
7/12 -> 7/18

Campus Pride |
7/12 -> 7/20

Campus Pride |
7/12 -> 7/20

Teaching For Economics |
7/12 -> 7/20

Campus Pride |
7/13 -> 7/20

13-1325 Wyatt Center - Remodel 3rd Floor Offices | Lot 90 Near Wyatt Center
7/14 -> 7/25

SAVY Program |
7/14 -> 7/18

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

VU Kennedy NSSI |
7/14 -> 7/18

Law School - remove mailboxes | Law School
7/15 -> 7/16

Independent School Leadership | Payne Hall, Magnolia Circle
7/16 -> 7/16

Independent School Leadership | Payne Hall, Magnolia Circle
7/16 -> 7/16

17

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1331 Olin Hall - Remodel Rooms 406 and 219 | Lot 16 Near Olin Hall
7/08 -> 7/18

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Discovery Education |
7/10 -> 7/18

Lot 18 Olin Hall Project |
7/11 -> 7/17

VU Men's Baseball Camp |
7/12 -> 7/17

Kennedy NSSI |
7/12 -> 7/18

Campus Pride |
7/12 -> 7/20

Campus Pride |
7/12 -> 7/20

Teaching For Economics |
7/12 -> 7/20

Campus Pride |
7/13 -> 7/20

13-1325 Wyatt Center - Remodel 3rd Floor Offices | Lot 90 Near Wyatt Center
7/14 -> 7/25

SAVY Program |
7/14 -> 7/18

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

VU Kennedy NSSI |
7/14 -> 7/18

YOPI-PP Early Arrivals |
7/17 -> 7/20

Law School - remove student mailboxes | Law School
7/17 -> 7/18

18

R & R Project # 14-1143 General Library re-roofing |
5/12 -> 7/18

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1331 Olin Hall - Remodel Rooms 406 and 219 | Lot 16 Near Olin Hall
7/08 -> 7/18

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Discovery Education |
7/10 -> 7/18

Kennedy NSSI |
7/12 -> 7/18

Campus Pride |
7/12 -> 7/20

Campus Pride |
7/12 -> 7/20

Teaching For Economics |
7/12 -> 7/20

Campus Pride |
7/13 -> 7/20

13-1325 Wyatt Center - Remodel 3rd Floor Offices | Lot 90 Near Wyatt Center
7/14 -> 7/25

SAVY Program |
7/14 -> 7/18

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

VU Kennedy NSSI |
7/14 -> 7/18

YOPI-PP Early Arrivals |
7/17 -> 7/20

Law School - remove student mailboxes | Law School
7/17 -> 7/18

YOPI-PP Attendees |
7/18 -> 7/20

YOPI-PP Single Event |
7/18 -> 7/18

Leading Change in Gifted Education | Commons Center
7/18 -> 7/18

Visitors from LMU Duncan School of Law | In front of Law School
7/18 -> 7/18

DAR Celebration | Kissam Center
7/18 -> 7/18

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

PreVU |
7/18 -> 7/18

Guest Speakers - Linley & McKay | Mayborn
7/18 -> 7/18

19

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

ID Tech Camp Staff |
5/28 -> 7/19

ID Tech Camp Staff |
5/28 -> 7/19

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Campus Pride |
7/12 -> 7/20

Campus Pride |
7/12 -> 7/20

Teaching For Economics |
7/12 -> 7/20

Campus Pride |
7/13 -> 7/20

13-1325 Wyatt Center - Remodel 3rd Floor Offices | Lot 90 Near Wyatt Center
7/14 -> 7/25

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

YOPI-PP Early Arrivals |
7/17 -> 7/20

YOPI-PP Attendees |
7/18 -> 7/20

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

EMBA Program Brunch | Student Life Center-Ballroom ABC
7/19 -> 7/19

EMBA Math Camp | 21st Avenue South & Broadway
7/19 -> 7/19

Minarich-Hams Wedding |
7/19 -> 7/19

EMBA Math & Stats Camp | 21st Avenue South & Broadway
7/19 -> 7/19

EMBA Program Brunch | Student Life Center-Ballroom ABC
7/19 -> 7/19

20

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

SAVY |
6/01 -> 7/20

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Contractor working at New College Halls buildings | New college Halls Buildings Main entrance
7/02 -> 7/20

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Campus Pride |
7/12 -> 7/20

Campus Pride |
7/12 -> 7/20

Teaching For Economics |
7/12 -> 7/20

Campus Pride |
7/13 -> 7/20

13-1325 Wyatt Center - Remodel 3rd Floor Offices | Lot 90 Near Wyatt Center
7/14 -> 7/25

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

YOPI-PP Early Arrivals |
7/17 -> 7/20

YOPI-PP Attendees |
7/18 -> 7/20

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

Gamebreaker Lacrosse |
7/20 -> 7/23

21

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

13-1325 Wyatt Center - Remodel 3rd Floor Offices | Lot 90 Near Wyatt Center
7/14 -> 7/25

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

Gamebreaker Lacrosse |
7/20 -> 7/23

Bryan Building - Fire System Upgrade | Bryan Building
7/21 -> 8/29

PreVU |
7/21 -> 7/21

Dudley Field - Replace Sewer Pump | Dudley Field
7/21 -> 7/23

Independent School Leadership | Payne Hall, Magnolia Circle
7/21 -> 7/21

USBCC |
7/21 -> 7/23

Carol Swain Legacy Project Interviews | Law School
7/21 -> 7/22

Project #14-1483 McTyiere Hall Summer Painting |
7/21 -> 8/15

Piedmont Natural Gas - Low pressure gas line installation |
7/21 -> 7/21

Carol Swain Legacy Project Interviews | Law School
7/21 -> 7/21

Garland meters |
7/21 -> 7/21

22

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

13-1325 Wyatt Center - Remodel 3rd Floor Offices | Lot 90 Near Wyatt Center
7/14 -> 7/25

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

Gamebreaker Lacrosse |
7/20 -> 7/23

Bryan Building - Fire System Upgrade | Bryan Building
7/21 -> 8/29

Dudley Field - Replace Sewer Pump | Dudley Field
7/21 -> 7/23

USBCC |
7/21 -> 7/23

Carol Swain Legacy Project Interviews | Law School
7/21 -> 7/22

Project #14-1483 McTyiere Hall Summer Painting |
7/21 -> 8/15

Chi Psi Early Arrivals | Lot 69 and 70
7/22 -> 7/27

EPRI Nuclear Fuel Cycle Assessment Workshop |
7/22 -> 7/23

Project #14-1294 |
7/22 -> 7/30

Independent School Leadership | Payne Hall, Magnolia Circle
7/22 -> 7/22

Carol Swain Legacy Project Interviews | Law School
7/22 -> 7/22

N/A | Central Library
7/22 -> 7/22

23

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

13-1325 Wyatt Center - Remodel 3rd Floor Offices | Lot 90 Near Wyatt Center
7/14 -> 7/25

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

Gamebreaker Lacrosse |
7/20 -> 7/23

Bryan Building - Fire System Upgrade | Bryan Building
7/21 -> 8/29

Dudley Field - Replace Sewer Pump | Dudley Field
7/21 -> 7/23

USBCC |
7/21 -> 7/23

Project #14-1483 McTyiere Hall Summer Painting |
7/21 -> 8/15

Chi Psi Early Arrivals | Lot 69 and 70
7/22 -> 7/27

EPRI Nuclear Fuel Cycle Assessment Workshop |
7/22 -> 7/23

Project #14-1294 |
7/22 -> 7/30

Chi Psi Regular Attendees | Lot 69 and 70
7/23 -> 7/27

CRESP Risk Management Meeting | Garland Avenue (Meeting being held in Buttrick and Jacobs Hall)
7/23 -> 7/25

Independent School Leadership | Payne Hall, Magnolia Circle
7/23 -> 7/24

24

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

13-1325 Wyatt Center - Remodel 3rd Floor Offices | Lot 90 Near Wyatt Center
7/14 -> 7/25

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

Bryan Building - Fire System Upgrade | Bryan Building
7/21 -> 8/29

Project #14-1483 McTyiere Hall Summer Painting |
7/21 -> 8/15

Chi Psi Early Arrivals | Lot 69 and 70
7/22 -> 7/27

Project #14-1294 |
7/22 -> 7/30

Chi Psi Regular Attendees | Lot 69 and 70
7/23 -> 7/27

CRESP Risk Management Meeting | Garland Avenue (Meeting being held in Buttrick and Jacobs Hall)
7/23 -> 7/25

Independent School Leadership | Payne Hall, Magnolia Circle
7/23 -> 7/24

VUMC PCC | OGSM - Management Hall
7/24 -> 7/25

PCC | OGSM -
7/24 -> 7/25

Nashville Vanderbilt Chapter Tour of Warren and Moore Colleges | Warren and Moore
7/24 -> 7/24

25

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

Aspirnaut |
6/01 -> 7/25

PTY-VSA Staff |
6/01 -> 7/25

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

R & R 2014 Project #14-1143 Re-roof General Library |
7/02 -> 7/25

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

Project 13-1330 painting exterior of East Hall |
7/09 -> 7/25

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

13-1325 Wyatt Center - Remodel 3rd Floor Offices | Lot 90 Near Wyatt Center
7/14 -> 7/25

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

Bryan Building - Fire System Upgrade | Bryan Building
7/21 -> 8/29

Project #14-1483 McTyiere Hall Summer Painting |
7/21 -> 8/15

Chi Psi Early Arrivals | Lot 69 and 70
7/22 -> 7/27

Project #14-1294 |
7/22 -> 7/30

Chi Psi Regular Attendees | Lot 69 and 70
7/23 -> 7/27

CRESP Risk Management Meeting | Garland Avenue (Meeting being held in Buttrick and Jacobs Hall)
7/23 -> 7/25

VUMC PCC | OGSM - Management Hall
7/24 -> 7/25

PCC | OGSM -
7/24 -> 7/25

14-1520 Wilson Hall - Replace Cabinets and Flooring in Animal Care Facility | Wilson Hall
7/25 -> 8/01

PreVU |
7/25 -> 7/25

Drum Corps Show |
7/25 -> 7/25

VUSM White Coat Ceremony | 25th Avenue Garage - Highland Entrance - upper spaces - can we arrange a no ticket, no tow scenario??
7/25 -> 7/25

VSA #3 Parent Parking |
7/25 -> 7/25

26

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

Bryan Building - Fire System Upgrade | Bryan Building
7/21 -> 8/29

Project #14-1483 McTyiere Hall Summer Painting |
7/21 -> 8/15

Chi Psi Early Arrivals | Lot 69 and 70
7/22 -> 7/27

Project #14-1294 |
7/22 -> 7/30

Chi Psi Regular Attendees | Lot 69 and 70
7/23 -> 7/27

14-1520 Wilson Hall - Replace Cabinets and Flooring in Animal Care Facility | Wilson Hall
7/25 -> 8/01

Chi Psi Fraternity Conference | Student Life Center-Ballroom ABC
7/26 -> 7/26

Faculty meeting 7/26/14 | School of Nursing
7/26 -> 7/26

PAVE Move-out |
7/26 -> 7/26

TRIAD Families First Program | One Magnolia Circle - rm 241
7/26 -> 7/26

TRIAD Families First Program | One Magnolia Circle - rm 241
7/26 -> 7/26

27

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

Bryan Building - Fire System Upgrade | Bryan Building
7/21 -> 8/29

Project #14-1483 McTyiere Hall Summer Painting |
7/21 -> 8/15

Chi Psi Early Arrivals | Lot 69 and 70
7/22 -> 7/27

Project #14-1294 |
7/22 -> 7/30

Chi Psi Regular Attendees | Lot 69 and 70
7/23 -> 7/27

14-1520 Wilson Hall - Replace Cabinets and Flooring in Animal Care Facility | Wilson Hall
7/25 -> 8/01

28

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

Bryan Building - Fire System Upgrade | Bryan Building
7/21 -> 8/29

Project #14-1483 McTyiere Hall Summer Painting |
7/21 -> 8/15

Project #14-1294 |
7/22 -> 7/30

14-1520 Wilson Hall - Replace Cabinets and Flooring in Animal Care Facility | Wilson Hall
7/25 -> 8/01

PreVU |
7/28 -> 7/28

Autism Speaks Autism Treatment Network Kickoff Event |
7/28 -> 7/28

FY14 R & R Project 14-1143 Reroof General Library |
7/28 -> 8/08

29

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

Bryan Building - Fire System Upgrade | Bryan Building
7/21 -> 8/29

Project #14-1483 McTyiere Hall Summer Painting |
7/21 -> 8/15

Project #14-1294 |
7/22 -> 7/30

14-1520 Wilson Hall - Replace Cabinets and Flooring in Animal Care Facility | Wilson Hall
7/25 -> 8/01

FY14 R & R Project 14-1143 Reroof General Library |
7/28 -> 8/08

Independent School Leadership | Payne Hall, Magnolia Circle
7/29 -> 7/29

14-1053 | In front of Payne building at Peabody. On the Payne building side.
7/29 -> 7/29

CMA summer workshops | The John Seigenthaler Center
7/29 -> 8/01

Women in Technology in Tennessee |
7/29 -> 7/29

30

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

Bryan Building - Fire System Upgrade | Bryan Building
7/21 -> 8/29

Project #14-1483 McTyiere Hall Summer Painting |
7/21 -> 8/15

Project #14-1294 |
7/22 -> 7/30

14-1520 Wilson Hall - Replace Cabinets and Flooring in Animal Care Facility | Wilson Hall
7/25 -> 8/01

FY14 R & R Project 14-1143 Reroof General Library |
7/28 -> 8/08

CMA summer workshops | The John Seigenthaler Center
7/29 -> 8/01

Dean Dowell Retirement | Central Library
7/30 -> 7/30

Tennessee Fiduciary Summit |
7/30 -> 7/30

Project 14-1053 | Susan Gray School Parking loading area
7/30 -> 8/04

14-1056 | West side of Peabody Library. ( 21st ave. side)
7/30 -> 8/03

31

R & R Project # 14-1285 Carmichael Tower III Elevator modernization |
5/14 -> 8/01

Paking for Contractors 118 29th Ave Building |
5/19 -> 8/01

R & R FY14 Project #14-1285 Carmichael Tower 3 Elevator Modernization |
5/21 -> 8/01

Orion |
5/21 -> 8/01

2014 Summer Intern Housing |
5/25 -> 8/02

Sarratt Youth Art Institute | 208 24th Ave N and Sarratt Student Ctr
5/26 -> 8/01

Summer Camp Pick up / Drop off |
6/02 -> 8/01

Blair School of Music Organ Replacement | Blair School of Music
6/02 -> 7/31

14-1139 Garland Hall - Replace Steam Station and AHUs |
6/16 -> 8/01

Home Economics Lighting Upgrade | Home Economics
6/30 -> 8/01

Project 14-1465 | Lewis House loading dock area, Lot 24
7/01 -> 8/01

Project #14-1490 Summer Housing Painting Morgan House |
7/02 -> 8/01

14-1287 CT4 - Replace Drain Lines and Ceilings in Student Bathrooms | Carmichael Towers 3&4
7/03 -> 8/01

Wyatt Center Basement Renovation | Wyatt Center
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Sarratt AHU Repair | As close to Sarratt as possible
7/07 -> 8/15

Project #14-1484 - 2014 Summer Housing Painting - |
7/08 -> 8/15

14-1287 Carmichael Tower 4 - Replace Drain Lines and Ceilings in Student Bathrooms | Lot 206 at Carmichael Towers 3&4
7/09 -> 8/01

Blair School AHU Repair | As close to Blair as possible
7/14 -> 8/15

14-1201 SC Physics - Replace AHUs |
7/18 -> 8/08

Bryan Building - Fire System Upgrade | Bryan Building
7/21 -> 8/29

Project #14-1483 McTyiere Hall Summer Painting |
7/21 -> 8/15

14-1520 Wilson Hall - Replace Cabinets and Flooring in Animal Care Facility | Wilson Hall
7/25 -> 8/01

FY14 R & R Project 14-1143 Reroof General Library |
7/28 -> 8/08

CMA summer workshops | The John Seigenthaler Center
7/29 -> 8/01

Project 14-1053 | Susan Gray School Parking loading area
7/30 -> 8/04

14-1056 | West side of Peabody Library. ( 21st ave. side)
7/30 -> 8/03