Group Resources

Group moved into to a newly renovated space on the 6th floor of the Stevenson center 7600 with 17 hoods. We have space for 16 students. Adjacent to the lab we have an instrument room with HPLC/GPC, peptide synthesizer, hydrogenator, biotage, cell hood, incubator and two lyophilizers.

    


Copyright © 2006 Dr. Eva Harth| Site design by: Academic Web Pages